Start Date

28-4-2022 9:00 AM

Document Type

Poster

Description

This project covers the use of the Rational Method in finding the peak runoff for an area on JCCC's campus. In order to find the runoff, I accounted for runoff-coefficients, intensity, and area of the given area. Through graphs provided during class, along with assistance from Excel and Bluebeam, I was able to find the accurate variables for the Rational Method. I found the Peak Runoff for the given area to be 84 cfs.

Comments

The faculty mentor for this project was Matt Andring, Drafting.

Image

Share

COinS
 
Apr 28th, 9:00 AM

Determination of Peak Runoff Using the Rational Method

This project covers the use of the Rational Method in finding the peak runoff for an area on JCCC's campus. In order to find the runoff, I accounted for runoff-coefficients, intensity, and area of the given area. Through graphs provided during class, along with assistance from Excel and Bluebeam, I was able to find the accurate variables for the Rational Method. I found the Peak Runoff for the given area to be 84 cfs.